IndustriesFlooring

Flooring contractor software

Business Genie is flooring contractor software for the measure, the proposal and the install. Send the proposal with a deposit, schedule installers, see what each floor cost with job costing, and get paid by card, Apple Pay, PayPal, Venmo or Cash App.

Plans from $50 a month · One month free · No credit card

Route optimization
As booked65 miAs routed
37 mi
28 mi shorter

One estimator’s day, in booked order and as routed. A sample flooring day, simulated, beside this.

Sample day · Flooring · 1 estimator
In the order it was booked: 8 jobs, 2 h 19 min of driving, 1 window missed. Done at 5:09 pm.
8 am9101112 pm123456
Booked65 mi
Routed37 mi

Late

Sample day, simulated: one estimator, eight booked visits and one call from an install crew, on a one-mile street grid at 28 mph.

A flooring day, as booked

A flooring estimator’s day is measures, sold as a morning or an afternoon because the homeowner has to be home, around the visits that cannot move: slab probes are read 24 hours after they were set, and last week’s floor gets its walkthrough. Written down as the calls came in, the morning runs from one edge of town to the other and back, and the probe reading slips past its hour.

  1. 1Carpet to plank in five roomsIn-home measure · Saguaro Blvd75 min8 am–12 pm
  2. 2Tile for a kitchen and two bathsIn-home measure · Ocotillo Rd60 min8 am–12 pm
  3. 3Reading yesterday’s slab probesSlab moisture test · Ironwood Ln25 min9 am–10:30 am
  4. 4Laminate for a back bedroomIn-home measure · Acacia Dr45 min8 am–12 pm
  5. 5Stairs and landing, carpet to oakIn-home measure · Palo Verde Dr60 min12 pm–4 pm
  6. 6Walkthrough on last week’s plankFinal walkthrough · Cholla St40 min12 pm–4 pm
  7. 7Quote to refinish oak floorsIn-home measure · Rio Salado Pkwy45 min12 pm–4 pm
  8. 8Vacant rental, carpet to plankIn-home measure · Juniper Way60 min

As booked: 2 h 19 min of driving, 1 time window missed, the last job done at 5:09 pm.

The same day, routed

Business Genie puts the day’s stops in the order that drives least, and keeps the time windows you promised and the length of every job.

In this sample the same 8 jobs take 1 h 19 min of driving instead of 2 h 19 min, with every time window kept instead of 1 missed, and the last one is finished at 4:09 pm instead of 5:09 pm.

How route optimization works in Business Genie

11:10 am, a crack under the carpet

An install crew calls from Cedar Ave: with the old carpet up, the slab by the patio door has a crack with one side standing proud. It has to be ground flat before plank goes over it, and the homeowner has to sign for that first. The crew lays the bedrooms meanwhile.

Add the job and Business Genie re-orders the rest of the day around it, keeping the time windows already promised. The estimator gets turn-by-turn directions to the next stop.

In this sample the call is fitted in at 12:19 pm and the day is done at 5:01 pm. Taken straight after the job in hand, with the rest driven as booked, the day runs to 5:44 pm.

At the measure

Stop 1 · Saguaro Blvd · 75 min

8:13 am–9:28 am · 13 min drive in

Carpet to plank in five rooms.

A flooring measure ends in a drawing, and everything the proposal is priced from comes off it: the square feet, the boxes of plank, the trim and transitions by the foot, and the days the installers are booked for. How the plank is laid changes the numbers: on a diagonal or in herringbone more planks are cut at the walls, and the crew lays slower.

Sample measure
52′Living room18′ × 17′Bedroom 212′ × 11′Bed 310′ × 11′Primary12′ × 14′6″Hall22′ × 3′6″KitchenLaundryHall bathPrimary bathLow spot

Straight, laid along the hall. 241 whole planks and 119 cut to fit at the walls, the closets and the doorways. The piece cut off the end of one row starts the next, so little of what is cut is thrown away. Estimated at 10% over the measured floor: 37 boxes.

What the proposal is priced from

LineWorked outQuantity
799 sq ft
879 sq ft
37 boxes
799 sq ft
89 sq yd
20 sq ft
260 ft
18′6″
4 rooms

The install it books, for a crew of two

3 days

19.3 h of work on 8-hour days: the plank at 500 sq ft a day, laid straight.

Sample measure, simulated: a single-story house, drawn on 2 ft squares. The planks are laid on the drawing row by row from the back wall. The allowances for cuts (10% straight, 15% diagonal, 20% herringbone) are the trade’s usual estimates, and every maker’s box holds a different amount. The install is at sample rates for a crew of two (500 sq ft a day straight, 400 sq ft a day diagonal, 200 sq ft a day herringbone); every crew’s own will differ.

Route your own flooring day

Put in your own jobs, how long each takes and the windows you promise, and Business Genie puts them in the order that drives least, and re-orders it when a call comes in.

The first month is free. The team sets up your account and moves your customer data over at no charge, and route optimization is on every plan.

Flooring jobs, and how long they take

The work a flooring business books, and how long each job takes once the estimator is there. Business Genie keeps the length you set for each job when it routes the day.

  • Slab moisture test20–45 min×1
  • Change order on a job underway20–45 min×1
  • Final walkthrough30–60 min×1
  • Warranty inspection30–60 min–
  • In-home measure45–90 min×6
Hours on site, 0 to 2 h, the longest job in the sample day: solid for a quick job of each kind, pale for how long one can run. On the right, how many the sample day holds (9 jobs). Sample figures; every business’s own will differ.
  • Slab moisture test

    Holes are drilled into the concrete and sealed humidity probes set in them, then read 24 hours later. Wood and many vinyl floors have a limit for the slab’s moisture; a slab over it gets a moisture barrier or more time to dry.

  • Change order on a job underway

    The crew has found what the measure could not see: a cracked or uneven slab, a soft subfloor by a toilet, a second floor glued under the carpet. The extra work is looked at, priced and signed before the crew covers it.

  • Final walkthrough

    The homeowner walks the new floor with the estimator: the transitions, the trim, the cuts at the door jambs, anything that flexes or sounds hollow. Anything left is listed for the crew, and the balance is invoiced.

  • Warranty inspection

    A floor that has gapped, cupped, started to squeak or lifted at a seam is looked at where it lies: the gaps measured, the slab or subfloor under it checked for moisture, photographs taken. What was the install goes back to the crew; what was the product goes to the maker as a claim.

  • In-home measure

    Every room is measured wall to wall, closets and doorways included, and drawn to scale. The subfloor is checked for flat and for squeaks, the stairs are counted, and the homeowner holds the samples from the van against their own light and walls.

Questions about flooring contractor software

Can flooring customers pay a deposit online?
Yes. Proposals in Business Genie can ask for a deposit, paid by card, Apple Pay, PayPal, Venmo or Cash App.
Do installers track their hours?
Yes. Business Genie has GPS time tracking in the iOS and Android app.
Does it sync with QuickBooks?
Yes. Business Genie syncs with QuickBooks Online.