IndustriesConcrete

Concrete contractor software

Business Genie is concrete contractor software for bids, crews and job costs. Send a proposal with a deposit, schedule and dispatch crews, see with job costing what each pour cost, and get paid by card, Apple Pay, PayPal, Venmo or Cash App.

Plans from $50 a month · One month free · No credit card

Route optimization
As booked39 miAs routed
27 mi
12 mi shorter

One crew’s day, in booked order and as routed. A sample concrete day, simulated, beside this.

Sample day · Concrete · 1 crew
In the order it was booked: 4 jobs, 1 h 34 min of driving, every window kept. Done at 3:04 pm.
5 am6789101112 pm12345
Booked39 mi
Routed27 mi

Before first light

Sample day, simulated: one crew, a pour at first light, three more jobs and one call, on a one-mile street grid at 25 mph with a trailer.

A concrete day, as booked

A concrete crew’s day is built around the pour. The ready-mix truck is ordered for 6:00, at first light, before the heat can set the concrete faster than the crew can finish it, so the pour goes first. The rest of the day is the other visits a concrete job needs, written down in the order the jobs were sold: pulling yesterday’s forms on one side of town, forming tomorrow’s pour on the other, a repair back across. With a trailer behind the truck, every crossing is slow.

  1. 1New driveway, 8 yardsPour and finish · Desert Willow Ln240 min5 am–6 am
  2. 2Forms off yesterday’s patioStripping forms · Cholla St45 min
  3. 3Forms and base for tomorrow’s pourForming and base prep · Acacia Dr150 min
  4. 4Front steps, corners broken offConcrete repair · Agave Way75 min1 pm–4 pm

As booked: 1 h 34 min of driving, the last job done at 3:04 pm.

The same day, routed

Business Genie puts the day’s stops in the order that drives least, and keeps the time windows you promised and the length of every job.

In this sample the same 4 jobs take 1 h 05 min of driving instead of 1 h 34 min, and the last one is finished at 2:35 pm instead of 3:04 pm.

How route optimization works in Business Genie

10:40 am, a lifted slab

A property manager calls: a sidewalk slab at an office entrance has lifted an inch at the joint, and they want the trip hazard made safe today.

Add the job and Business Genie re-orders the rest of the day around it, keeping the time windows already promised. The crew gets turn-by-turn directions to the next stop.

In this sample the call is fitted in at 12:11 pm and the day is done at 3:20 pm. Taken straight after the job in hand, with the rest driven as booked, the day runs to 3:56 pm.

At the pour

Stop 1 · Desert Willow Ln · 240 min

5:22 am–9:22 am · 22 min drive in

New driveway, 8 yards.

Ready-mix is sold to a clock. ASTM C94, the standard it is bought to, has the truck emptied within 90 minutes of the water going in at the plant, so a crew that is late to its own pour keeps the truck waiting while the concrete in the drum keeps setting. Once it is down, the concrete sets the pace: the finishers wait on it, then have to keep up with it.

Sample pour, minute by minute7:23 am · waiting on the set

30 × 20 ft × 4 in = 7.4 yd³ in the forms · 8 ordered · joints every 10 ft

5 am6789

Drive in On the road, waiting Before first light

The crew is on site at 5:22 am, before first light, and set up when the truck backs in at 6:00 am. The 8 yards are in the forms 25 min inside their 90 minutes, then the crew waits 45 min on the set before it can edge and joint. The broom finish is done at 8:50 am, and the driveway is taped off, curing, at 9:22 am.

Sample pour, simulated: stop 1 of the day, a driveway from one truck. Move along the clock, or choose a step, to see the slab at that minute.

Route your own concrete day

Put in your own jobs, how long each takes and the windows you promise, and Business Genie puts them in the order that drives least, and re-orders it when a call comes in.

The first month is free. The team sets up your account and moves your customer data over at no charge, and route optimization is on every plan.

Concrete jobs, and how long they take

The work a concrete business books, and how long each job takes once the crew is there. Business Genie keeps the length you set for each job when it routes the day.

  • Site visit and estimate30–60 min–
  • Stripping forms30–90 min×1
  • Trip hazard grinding30–90 min×1
  • Concrete repair1–3 h×1
  • Cleaning and sealing90–240 min–
  • Forming and base prep2–6 h×1
  • Pour and finish3–6 h×1
  • Stamped and decorative pour4–7 h–
  • Tear-out and haul-off3–8 h–
Hours on site, 0 to 6 h, the longest job in the sample day: solid for a quick job of each kind, pale for how long one can run, broken at the edge where a job runs past the scale. On the right, how many the sample day holds (5 jobs). Sample figures; every business’s own will differ.
  • Site visit and estimate

    The area is measured, the grade and drainage are checked, and the route in for the mixer truck or a pump is walked. The finish is talked through, and the proposal is sent with a deposit on it.

  • Stripping forms

    The day after the pour, the stakes and forms come off, the edges are backfilled and the site is cleaned up. The forms go back on the trailer for the next job.

  • Trip hazard grinding

    A sidewalk slab that has lifted at a joint is ground down to a gentle slope with a concrete grinder, so the edge no longer catches a foot.

  • Concrete repair

    Cracks are cleaned out and filled, broken step corners and spalled spots are patched, and the patch is finished to match the concrete around it.

  • Cleaning and sealing

    The concrete is pressure-washed and left to dry, then sealer is rolled or sprayed on. Stamped and coloured concrete gets it most, and needs it again every few years.

  • Forming and base prep

    The ground is graded, base is spread and compacted, forms are staked to grade with the fall away from the house, and rebar or mesh is set on chairs, ready for the truck.

  • Pour and finish

    A driveway, patio, walk or garage slab, placed straight from the truck’s chute, or pumped where the truck can’t back up to the forms. The more yards in one pour, the more finishers it takes, since all of it has to be finished before it sets.

  • Stamped and decorative pour

    Colour goes in the mix or on the surface, and the texture mats are pressed in at just the right set, a row at a time, before the slab is too hard to take the pattern. The sealer goes on at a later visit.

  • Tear-out and haul-off

    The old driveway, walk or patio is broken up with a breaker and a skid steer, loaded into a dump trailer and hauled to a recycler, leaving the ground ready to grade.

Questions about concrete contractor software

Can I take a deposit on a concrete job?
Yes. Proposals in Business Genie can ask for a deposit, paid by card, Apple Pay, PayPal, Venmo or Cash App.
Do crews track hours in the app?
Yes. Business Genie has GPS time tracking in the iOS and Android app.
Does it sync with QuickBooks?
Yes. Business Genie syncs with QuickBooks Online.